Skip to main content
Expand to the South East of Ireland

Carlow Advance Building Solution

  • Ancillary space totalling c.1,157m² (c.12,454 ft²) including office space over two floors.

  • Technology / Manufacturing space of c.1,679 m² (c.18,077 ft² )

Advance Building Solution

Advance Building Solution

Advance Building Solution of c. 3,189 m² (approx. 34,334 ft²) on a site area of c. 2.34 hectares (c. 5.78 acres). Within lies a Technology / Manufacturing space of c. 1,679 m² (c. 18,077 ft²) with roller shutter doors to service yard. This is accompanied by ancillary space totalling c. 1,157m² (c. 12,454 ft² ) including two storey office accommodation and high-profile double height atrium at reception. Access to 2 Technological Universities - (Carlow and Waterford) within the region. Other companies in the region include MSD, Unum, Netwatch and Alltech

Download brochure here

Carlow Advance Building Solution

  • AVAILABLE NOW
  • Ideal home for manufacturing and international service companies

Building Details

  • Advance Building Solution of c. 3,189 m²(c. 34,334 ft²) on a site area of c. 2.34 hectares (c.5.78 acres)
  • Technology / Manufacturing space of c.1,679 m²(c.18,077 ft²) with roller shutter doors to service yard
  • Clear internal eaves height of c. 7.20 m
  • Ancillary space totalling c.1,157 m² (c.12,454 ft²) including office space over two floors (with raised access floors, suspended ceilings, lighting, air conditioning) showers, toilets and common areas
  • Surface car parking for 70 cars, 4 accessible, 2x EV charging terminals and cycle parking onsite

Sustainability

  • Energy Rating (BER) Certification B1
  • Designed to achieve LEED CS accreditation and nZEB compliance

Advance Building Solution of c. 3,189 m² on a site area of c. 2.34 hectares

Advance Building Solution of c. 3,189 m² on a site area of c. 2.34 hectares

Technology / Manufacturing space of c.1,679 m² (c.18,077 ft² )

Technology / Manufacturing space of c.1,679 m² (c.18,077 ft² )

Energy Rating (BER) Certification B1

Energy Rating (BER) Certification B1

Car parking for 70 cars, 4 accessible, 2x EV charging terminals and cycle parking onsite

Car parking for 70 cars, 4 accessible, 2x EV charging terminals and cycle parking onsite

Clear internal eaves height of c. 7.20 m

Clear internal eaves height of c. 7.20 m

Advance Building Solution of c. 3,189 m² on a site area of c. 2.34 hectares
Technology / Manufacturing space of c.1,679 m² (c.18,077 ft² )
Energy Rating (BER) Certification B1
Car parking for 70 cars, 4 accessible, 2x EV charging terminals and cycle parking onsite
Clear internal eaves height of c. 7.20 m

Base Specifications

Production Space Production Space c.18,077 SQF
Ground Floor Office Ground Floor Office c 4,187 SQF
First Floor Office First Floor Office c.4,219 SQF
Total Floor Area Total Floor Area c. 34,334 SQF

Latest News

Takeda Celebrates 25 Years of Business in Ireland
Biopharma
  • 26/09/2022
  • 4 minute read

Takeda Celebrates 25 Years of Business in Ireland

Quarter-century milestone marked at the pharmaceutical company’s Bray manufacturing site

Read more
IDA Ireland half-year FDI results highest ever
Border
  • 06/07/2022
  • 10 minute read

IDA Ireland half-year FDI results highest ever

IDA Ireland, the inward investment agency of the Irish Government, today reported significant investment growth in the first half of 2022, returning FDI employment creation plans to above the pre-pand...

Read more